A premiere address in Toronto’s Financial District, 160 Front Street West is a 46-story structural steel-framed commercial office tower designed to add a distinctive silhouette to the City’s skyline. Although complex, PCL’s in-house building envelope experts optimized design and constructability of the curved cladding that wraps all four exterior walls and integrates the heritage masonry of the 70-year-old, six-story building previously located on the site.
Problem
Our preconstruction experts drive best practices and lessons learned knowledge to maximize design and construction efficiencies, as well as continuous value engineering to deliver best value for lowest cost without compromising your design vision.
Solution
The price of labor and materials can be fluid and subject to change throughout the project. Lump sum contracts generally do not account for these fluctuations, so contractors have to absorb the cost if prices rise. However, they can also realize savings if rates go down. These risks are arguably more pronounced in extended projects.
Contractors must factor in possible upward fluctuations and price the project accordingly when providing the estimate.